Klime Studio

The brand and product studio
for software companies.

We bring the taste and creativity AI can't.

Book a Call
4.9/5.0
Limora AI dashboard interface
Stage for Mac download page
Limora AI brand system and app icon
Stage project dashboard interface
Galadrim logo system and lockups
Limora AI generation editor
Renewable energy campaign, poster system
Limora AI website, how it works section

How the work runs

1.Research and strategy

We study your company, your category, your competitors and your customers, then decide what you should stand for before anyone opens a design tool.

2.Brand system

Logo, typography, color, layout and iconography, built as one system with the rules that keep it consistent as you grow.

3.Website and product

We apply the system to the two surfaces that sell software, your marketing site and the product itself, and we build them live.

Adrien Ninet, founder of Klime Studio Adrien Ninet

Meet the founder

Almost every product looks the same now. AI made building nearly free, and the market filled with software that works fine and feels like nothing.

Your users decide what you are worth in about five seconds, and most of them are deciding you are one of the dozen tools they saw this week.

I started Klime to end that.
I run two software products of my own, Limora and Stage, so none of this is theory to me.

If your product already works and people already pay for it, what stands between you and a higher price is not another feature. It is whether the whole thing feels like it came from a person rather than a prompt, and that difference is a decision.

Questions

Do you do development?

We build your website ourselves and put it live, because design that never ships is worth nothing. Your product stays with your engineers. We hand them a design system with real tokens and components, so they can build it properly.

What does it cost?

Projects start at $5,000 and we do not go below that. A brand system costs $5,000 to $15,000, depending on how much you need. Add the website and the product design and it starts at $30,000. Book a call and you will have a number for your scope before the call is over.

How long does it take?

A brand system takes a few weeks. A full project with the website and the product takes a few months. You get real dates on day one and we keep them. We are faster than most studios because our research and strategy are AI-assisted, not because we skip them.

Can we not just use AI for the design?

You can, and you will get something that works and looks like everything else, because it knows nothing about your company. We use the same tools. What is missing is not the execution, it is the decisions behind it. Those are what you are paying us for.

We only need the website. Is that possible?

Yes. We still start with the brand, because a site is only as good as the thinking behind it. For software, the website is also only half the job. If your site looks great and your product still looks unfinished, that gap hurts you more than a plain site would.

Is Adrien Ninet the designer?

Adrien sets the direction on every project and signs off on the work before it reaches you. The design is done by our designers, working to that direction. You also get a project lead who keeps you updated the whole way through, so you always know where things stand.

Who is this not for?

It is not for products with no users and no funding, or for people who just want us to execute a design they have already decided on. What matters to us is that you have paying customers or money in the bank. How you built the product does not matter at all.

Start Project